Society of Construction Law (Singapore) Society of Construction Law (Singapore)
  • Home
  • About Us
    • Introduction
    • Our Current & Past Councils
    • List of Past Chairs
    • Constitution
    • Data Protection
  • Events
    • Events Calendar
    • Past Events Photo Gallery
      • Year 2025
      • Year 2024
      • Year 2023
      • Year 2022
      • Year 2021
      • Year 2020
      • Year 2019
      • Year 2018
      • Year 2017
      • Year 2016
      • Year 2015
      • Year 2014
      • Year 2013
    • Post Event Updates
  • Resources
    • Seminar / Conference Papers
    • Webinar Materials
    • Council Messages
    • Articles
    • Newsletters
      • 2025
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020
      • Pre 2020
    • Other News
    • Links to Relevant Websites
    • Members’ Only Resources (log-in required)
  • Membership
    • Why Join Us?
    • Individual Member Directory
    • Business Member Listing
    • Apply for Individual Membership
    • Apply for Business Membership
  • Contact Us
    • Contact Details
    • Speaking Request Form
    • Article Submission Form
    • Feedback Form

Member Login/Logout     
Society of Construction Law (Singapore) Society of Construction Law (Singapore)
  • Home
  • About Us
    • Introduction
    • Our Current & Past Councils
    • List of Past Chairs
    • Constitution
    • Data Protection
  • Events
    • Events Calendar
    • Past Events Photo Gallery
      • Year 2025
      • Year 2024
      • Year 2023
      • Year 2022
      • Year 2021
      • Year 2020
      • Year 2019
      • Year 2018
      • Year 2017
      • Year 2016
      • Year 2015
      • Year 2014
      • Year 2013
    • Post Event Updates
  • Resources
    • Seminar / Conference Papers
    • Webinar Materials
    • Council Messages
    • Articles
    • Newsletters
      • 2025
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020
      • Pre 2020
    • Other News
    • Links to Relevant Websites
    • Members’ Only Resources (log-in required)
  • Membership
    • Why Join Us?
    • Individual Member Directory
    • Business Member Listing
    • Apply for Individual Membership
    • Apply for Business Membership
  • Contact Us
    • Contact Details
    • Speaking Request Form
    • Article Submission Form
    • Feedback Form
  1. You are here:  
  2. Home
  3. Resources
  4. Articles
  5. Pay When Paid and Termination – the Singapore High Court untangles the SOP Act in Frontbuild Engineering & Construction Pte Ltd v JHJ Construction Pte Ltd [2021] SGHC 72

Articles

Details
20 October 2022
Hits: 1837

Rise and Fall

21 October 2022

There has been steady increase in interest in recent times from project participants on the use of price escalation clauses, driven by Covid-19 supply chain issues and inflation. Principals and contractors should consider, at the outset, how the risk of cost escalation can be minimised or shared on a project.

There are a number of ways to structure a construction contract to deal with the risk of cost escalation. Cost plus contracting is being sought more frequently by contractors. Principals who are less keen on paying on a cost-plus basis and who insist on a lump sum may have to accept much larger contingency in the present contracting environment. That contingency could be reduced by introducing price flexibility options into the contract. Price flexibility options include allowing for more provisional sums and providing for rise and fall.

Rise and fall clauses are making a comeback after decades of absence, when inflation was relatively low and supply chain issues were not acute. Their absence has meant it is necessary for project stakeholders to now reacquaint themselves with the principles behind a workable rise and fall clause.

A simple operative rise and fall provision would state that the contract sum (or specific rates and prices) will be adjusted for rise and fall in costs as set out in an accompanying schedule. The schedule would contain a description of what aspects of the contract sum are subject to rise and fall and a formula for the cost adjustment. Usually, the rise and fall formula adjusts materials and/or labour costs and is a result of close consultation between quantity surveyors or other technical personnel and legal advisers.

The elements of the rise and fall formula will typically involve some consideration of:

  • which components of the contract sum, or which rates and prices in a schedule of rates, are to be adjusted;
  • which indices are to be used to measure the price movements e.g. CPI or other published indices;
  • where the adjustment is to a schedule of rates then if the schedule items are not already appropriately categorised they may need to be to match the chosen indices;
  • a risk buffer may be considered e.g. the first 2% increase is the contractor’s risk;
  • the base date;
  • the adjustment date;
  • the period within which movements in cost are to be measured, e.g. monthly or yearly.

Formulae for rise and fall can be complex, and it is advisable to do worked examples to make sure the formula works as intended. Careful drafting of the narrative aspects of the formula is also recommended, otherwise a disagreement could end up in litigation.

An example of a dispute that went to court regarding the reference dates is a case where it was unclear whether the calculation was to be by reference to the index at the date of tender/contract or periodically, given the formula allowed for periodic adjustment.1

Failure to provide in the contract for alternative indices could lead to the formula being inoperative with the consequence that no rise and fall adjustment can be made. Ambiguous words that allow for flexibility in selecting an alternative index if one is discontinued (such as ‘the nearest index consistent with the intention of this annexure’) may lead to disagreement and litigation.2

In conclusion, there is a need for some industry re-education on rise and fall provisions and care should be taken in drafting both the technical and the legal aspects of rise and fall clauses. 

Contributed by:

Greg Steinepreis - Partner, Squire Patton Boggs (Perth office)


[1] Lewis Construction (Engineering) Pty Ltd v Southern Electric Authority of Queensland (1976) 50 ALJR 769; [1975] QSCFC 23.  See also Codelfa Construction Pty Ltd v State Rail Authority of NSW (1982) 149 CLR 337.

[2] For example, Leighton Contractors Pty Ltd -v- Public Transport Authority of Western Australia [No 6] [2008] WASC 193. A case where the formula was ambiguous and a key price index was discontinued is Sino Iron Pty Ltd v Mineralogy Pty Ltd [2019] WASCA 80, although the formula concerned a royalty.

Latest Events

21 May 2025;
05:15PM - 07:30PM
UPDATED! Consultation in Progress: Exploring the Legal Intricacies of Consultants’ Duties (21 May 2025, 5.15pm - 7.30pm (GMT+8))
21 May 2025;
06:00PM - 11:59PM
Society of Construction Law Australia 2025 National Conference (21 - 23 May 2025, Brisbane)
10 Jul 2025;
05:00PM - 07:30PM
Strata Wars: Navigating MCST Disputes in Construction and Community (10 July 2025, 5.00pm - 7.30pm (GMT+8))
25 Sep 2025;
08:15AM - 07:15PM
SCL(S) Conference 2025: Transformation in the Infrastructure & Energy Sectors (25 September 2025, 8.15am - 7.15pm (GMT +8))
22 Oct 2025;
12:00AM
SAVE THE DATE: 11th SCL International Conference - Bridging Past, Present & Future (in the International Construction Industry (22-24 Oct 2024, Korea)
Bottom banner

© 2004-2025 Society of Construction Law (Singapore). All Rights Reserved. 
If you experience problems with this site, please contact the webmaster. 
Site designed and maintained by Intellitrain Pte Ltd.


Data Protection |Site Map

 

PCI Compliance and Malware Removal